Robotic production line

Industrial

Industrial equipment and production line sourcing

CRS PLUS sources industrial equipment and production-line hardware for manufacturers and plant operators across the GCC and Africa. The work splits into two distinct kinds of enquiry: sourcing a complete production line or major equipment package against a project specification, and sourcing spares for equipment already installed and running, where matching the existing specification exactly matters more than finding an equivalent. Hazardous-area certification is treated as a hard requirement where it applies, not a preference, and we confirm it before quoting rather than after delivery.

01What we source

Equipment and materialswe source for the sector.

01

Pumps

— centrifugal and positive-displacement pumps

02

Motors & drives

— electric motors, variable frequency drives

03

Switchgear

— low and medium voltage switchgear, motor control centres

04

Material handling

— conveyors, hoists, material handling equipment

05

Production lines

— complete lines and major equipment packages

06

Power transmission

— bearings, gearboxes, couplings

07

Instrumentation

— process instrumentation and control equipment

Standards we source against

  • CE marking
  • IEC standards
  • ATEX / IECEx for hazardous-area rated equipment

02Cross-sector equipment

Equipment categories currently catalogued that also serve this sector

Memory & Server Components — coming soon

03How it works

From enquiryto delivery.

One process for every requirement, whether it is a single part number or a full bill of quantities.

01

Send the requirement

Part-number list, bill of quantities, site list or tender document, in any format.

02

Review and clarification

We review the requirement and confirm anything unclear before quoting rather than assuming.

03

Structured offer

Configuration, condition, lead time, warranty and delivery terms, within 72 hours on average.

04

Inspection and delivery

Goods are inspected against the purchase order before shipment and delivered with full documentation to port or site.

Send your requirement

A part-number list, bill of quantities or tender specification is enough to start. A structured offer follows within 72 hours on average.